Demo Sign Off & Checklist

Purpose: here is a checklist of items to verify upon the completion of Phase 1. 

Read time: 1 min

 

Demo Sign Off and Checklist.png
Main Checklist
  • Ensure everything desired is removed

    • All of the extra pipes (Supply and Return), electrical wires, studs, 

  • No nails exposed where anyone can penetrate a foot or catch on an arm 

  • No open floor or damaged floor boards where anyone can fall through

  • Any potential water penetration points have been closed off

  • Temporary Cross-bracing has been installed for any walls that are "less than stable"